When → If → Then is enough canvas for Sheets
Why Sheet Engine uses a vertical recipe instead of a 9,000-app graph — and how dry-run sits in front of Live.
Operators already narrate the loop: when the form lands, if the lead is new, then send the acknowledgement. A graph that can reach every SaaS is a different product. Sheet Engine is the first product.
When
Form submit, a watched Status column, a new row, or Friday at 08:00. Manual run exists so last night’s miss is not a rebuild.
If
Column tests keep onEdit from becoming a mail storm. AND/OR is enough for v1. Paths can wait.
Then
Gmail from you, sheet writes, Doc/PDF to a folder you chose. Six sequential actions is the v1 ceiling on purpose.
Dry-run
The preview names rows and subjects with no send. Live is education, not a default.
Continue in docs or start the trial.